Application Case of Cementing Tools in Well Songke-2 (SK-2)

I.Project Overview

The Songliao Basin Deep Drilling Project for Resources and Environment (Well Songke-2 / SK‑2) is a national major geological scientific research project. It aims to obtain continuous in-situ geophysical parameters down to 6,400 meters in the Songliao Basin and establish a scientific "calibration well" for geophysical exploration, providing core data and technical support for the study of paleoclimatic and environmental evolution as well as the construction of the "Centennial Daqing".

• Total depth: 7108.00 m 

• Casing program: Five-stage casing completion 

• Bottom-hole temperature: 208℃ 

• Contractor: Institute of Exploration Techniques, Chinese Academy of Geological Sciences


 

2. Core Technical Challenges

Ultra-deep well operation: Multiple casing strings, long cementing intervals and high running-in risks

Ultra-high temperature environment: Bottom-hole temperature exceeding 200℃, which conventional tools cannot withstand

Research-grade high reliability: 100% one-time success with zero failures is mandatory

Long-section cementing requirements: Multi-stage cementing with stringent requirements for sealing performance and stability

3. Shangshan Petroleum Solution

In response to the ultra-deep, high-temperature and high-reliability requirements of Well Songke-2, Shangshan Petroleum delivered a full set of customized cementing tool systems.

Supporting Products

Liner hanger / Stage collar / Float collar & float shoe / Integral casing centralizer / Cementing plug A full range of cementing tools and accessories of φ508mm, φ339.7mm, φ244.5mm and φ177.8mm, totaling 328 sets (pieces).

Core Advantages

• High-temperature resistant material system, stably resistant to ultra-high temperatures above 205℃ 

• High-strength structural design, suitable for long-distance running in ultra-deep wells

• Precise actuation and reliable sealing, with a 100% operational success rate 

• On-site well support by a professional technical team and efficient full-process services

 


4. Key Construction Achievements

✅ One-time successful cementing of 7" (D177.8 mm) ultra-deep well liner for the fourth spud-in

✅ 7" casing successfully run to 5754.00 m 

✅ Liner hanger accurately set at 4369.00 m 

✅ Tools operated stably with zero failures under 208 ℃ high-temperature working condition 

✅ Excellent cementing quality, meeting the highest standards of national scientific drilling

5. Authoritative Recognition

 

6. Project Value

• Assist national continental scientific drilling projects to break through key equipment bottlenecks

• Demonstrate Shangshan Petroleum’s solid technical strength in ultra-deep, high-temperature and complex well operations

• Set a benchmark case for domestic cementing tools serving national major engineering projects

• Provide mature technical references for deep oil and gas exploration, scientific drilling, power grid deep wells and other related fields