I.Project Overview
The Songliao Basin Deep Drilling Project for Resources and Environment (Well Songke-2 / SK‑2) is a national major geological scientific research project. It aims to obtain continuous in-situ geophysical parameters down to 6,400 meters in the Songliao Basin and establish a scientific "calibration well" for geophysical exploration, providing core data and technical support for the study of paleoclimatic and environmental evolution as well as the construction of the "Centennial Daqing".
• Total depth: 7108.00 m
• Casing program: Five-stage casing completion
• Bottom-hole temperature: 208℃
• Contractor: Institute of Exploration Techniques, Chinese Academy of Geological Sciences

2. Core Technical Challenges
Ultra-deep well operation: Multiple casing strings, long cementing intervals and high running-in risks
Ultra-high temperature environment: Bottom-hole temperature exceeding 200℃, which conventional tools cannot withstand
Research-grade high reliability: 100% one-time success with zero failures is mandatory
Long-section cementing requirements: Multi-stage cementing with stringent requirements for sealing performance and stability
3. Shangshan Petroleum Solution
In response to the ultra-deep, high-temperature and high-reliability requirements of Well Songke-2, Shangshan Petroleum delivered a full set of customized cementing tool systems.
Supporting Products
Liner hanger / Stage collar / Float collar & float shoe / Integral casing centralizer / Cementing plug A full range of cementing tools and accessories of φ508mm, φ339.7mm, φ244.5mm and φ177.8mm, totaling 328 sets (pieces).
Core Advantages
• High-temperature resistant material system, stably resistant to ultra-high temperatures above 205℃
• High-strength structural design, suitable for long-distance running in ultra-deep wells
• Precise actuation and reliable sealing, with a 100% operational success rate
• On-site well support by a professional technical team and efficient full-process services

4. Key Construction Achievements
✅ One-time successful cementing of 7" (D177.8 mm) ultra-deep well liner for the fourth spud-in
✅ 7" casing successfully run to 5754.00 m
✅ Liner hanger accurately set at 4369.00 m
✅ Tools operated stably with zero failures under 208 ℃ high-temperature working condition
✅ Excellent cementing quality, meeting the highest standards of national scientific drilling
5. Authoritative Recognition

6. Project Value
• Assist national continental scientific drilling projects to break through key equipment bottlenecks
• Demonstrate Shangshan Petroleum’s solid technical strength in ultra-deep, high-temperature and complex well operations
• Set a benchmark case for domestic cementing tools serving national major engineering projects
• Provide mature technical references for deep oil and gas exploration, scientific drilling, power grid deep wells and other related fields